Workflows that kept running when the network did not

Every evaluation starts with one workflow and success criteria agreed up front, then measures the protocol against them on the operator's own devices and sites. These are the results, published as operators clear them.

Scope an evaluation See the solutions

Fernweh brings private messaging beyond internet coverage

Offline Protocol powers nearby message delivery in Fernweh, while encrypted history and search stay on the phone as connectivity changes

Read the story

Keep QSR orders moving through the rush, even offline

Offline Protocol connects the counter, drive-thru, kitchen, and handoff team around one shared order workflow, helping crews coordinate efficiently and keep service responsive.

Read the story

EV charging operations continue through cloud outages

Chargers and site controllers retain session state, resolve approved local commands, and return complete records to the existing charging platform after cloud outages

Read the story

Airline catering carries a complete record from kitchen to ramp

Production, quality, dispatch, and ramp teams share batch records and confirmed cart handoffs through cold-room and airside coverage gaps

Read the story

Fleet telemetry and field work stay connected beyond cellular coverage

Vehicle gateways and crew devices retain telemetry, assignments, and completion evidence locally, then reconcile with dispatch when a route becomes available

Read the story

Wind-farm technicians stay connected across brands and backhaul gaps

A shared local service layer gives technicians access to approved asset data and retains inspection evidence through backhaul outages, alongside existing SCADA and monitoring

Read the story

Secure offline coordination, built into OEM devices

A semiconductor integration packages a 449.5 KiB embedded runtime, gateway software, and qualification tools for smart-access and energy-device manufacturers

Read the story

Industrial inspection findings reach the lead without internet

A controlled two-phone demo connects defect capture to an on-site lead response, then reconciles both phones with a test backend

Read the story

What every study measures

The same five criteria, agreed before anything is installed, so results are comparable across sectors.

Qualified workflow completion

Did the work the operator cares about finish during the outage, not just after it.

Duplicate-free delivery

Every retry and reroute accounted for, with nothing processed twice on reconnection.

Reconciliation time

How long it took for local results to land in the system of record once a link returned.

Retained telemetry

What the operations record covered through the gap, and what it would have lost before.

Avoidable backhaul

Bytes that stayed on the local mesh instead of crossing metered or scarce links.

Bring the failure case. Leave with evidence. One workflow, agreed criteria, 4 to 16 weeks.

Scope an evaluation Read the docs